AWARDED PUBLIC WORKS PROJECTS

In accordance with Nevada Revised Statutes (NRS 338), awarded public works projects must be submitted to the Nevada State Board of Architecture, Interior Design and Residential Design for posting on the Board's official website.

Posting of awarded projects is for all public works projects, not just those that have been awarded to firms certified to receive local preference.

This posting requirement is in SB268 and is required by the statute effective October 1, 2011.

Posting of Awarded Public Works Projects by Nevada Government Entities

Download the Nevada Government Entity Filing of Awarded Public Works Projects Form and follow the instructions noted on the form.

PUBLIC WORKS PROJECTS AWARDED

Date Company Agency Name Project Preference
4/4/2024 Carpenter, Sellers, Del Gatto Architects City of Las Vegas Public Works Freedom Park Restroom and Upgrades No
Description: Architectural services to replace 50-year old restroom adjacent to Mojave parking lot. The upgrades to include new mural, sand volleyball courts, and shade pavilion.

 

Date Company Agency Name Project Preference
4/4/2024 IZ Design Studio City of Las Vegas Public Works Historic Westside Workforce Development Center No
Description: Provide architectural services for a Workforce Development Center at the Historic Westside School campus. the Workforce Development Center will be a pre-fabricated building.

 

Date Company Agency Name Project Preference
3/21/2024 Simpson Coulter Studios City of Henderson - Public Works Cadence Preschool No
Description: Design of a preschool

 

Date Company Agency Name Project Preference
3/12/2024 Collaborative Design Studio Washoe County School District Central Transportation Modernization No
Description: Architecture Design services for raising grade of site 2.1 feet and provide hazard material management plan per City of Sparks Fire.

 

Date Company Agency Name Project Preference
3/12/2024 Collaborative Design Studio Washoe County School District Reed HS Modernization (Pre Design) No
Description: Architecture Pre Design services for modernization of Reed HS.

 

Date Company Agency Name Project Preference
3/7/2024 H + K Architects Washoe County School District Capital Projects No
Description: Schematic Design, Design Development and Constrcution Design.

 

Date Company Agency Name Project Preference
3/7/2024 Architect Plus Washoe County School District Capital Projects No
Description: Architect Plus shall provide Pre Design services for the Palmer Elementary school modernization project.

 

Date Company Agency Name Project Preference
2/27/2024 H + K Architects Washoe County School District Loder ES Replacement Project No
Description: Provide conceptual studies to see how our current prototype building & play fields will fit on this site as well as, analyze parking needs, vehicle access, student/bus circ. /drop off, potential phasing while on occupied campus, mech. system alternatives & solar opportunities.

 

Date Company Agency Name Project Preference
2/26/2024 Van Woert Bigotti Architects Washoe County School District Mathews ES Modernization Study No
Description: Modernization/Addition Project Scope - Phase 1: Solidify scope, programming and to provide a minimum of two schematic (concept) design options for WCSD review/approval.

 

Date Company Agency Name Project Preference
2/21/2024 H & K Architects Washoe County School District Wooster HS Pre-Design No
Description: Provide pre-design services for replacement of Wooster High School.

 

Date Company Agency Name Project Preference
1/10/2024 PGAL City of Las Vegas, Public Works Fire Station 103 Replacement No
Description: Architectural services for the design and/or construction for the Fire Station 103 Replacement for the City of Las Vegas.

 

Date Company Agency Name Project Preference
12/13/2023 Van Woert Bigotti Architects Washoe County School District JL68185 - Sparks HS No
Description: Single point of entry and secure perimeter fencing.

 

Date Company Agency Name Project Preference
12/12/2023 Van Woert Bigotti Architects Washoe County School District JL68185 - McQueen HS No
Description: Single point of entry and secure perimeter fencing.

 

Date Company Agency Name Project Preference
12/12/2023 Van Woert Bigotti Architects Washoe County School District JL68185 - Damonte Ranch HS No
Description: Single point of entry and secure perimeter fencing

 

Date Company Agency Name Project Preference
11/29/2023 H & K Architects Carson City Public Works Buildings B and C Restroom Remodel No
Description: HK Architects has been selected to assist Carson City Public Works in remodeling a restroom in PW Building B and PW Building C.

 

Date Company Agency Name Project Preference
11/28/2023 H & K Architects Washoe County School District Marvin Picollo
Description: Single point of entry schematic drawings, construction drawings, bid assistance, and construction admin.

 

Date Company Agency Name Project Preference
11/20/2023 KME Architects, LLC City of Las Vegas, Public Works West Las Vegas Library - Conceptual Design for Remodel
Description: Provide architectural services for the West Las Vegas Library - Conceptual Design for Remodel for the City of Las Vegas.

 

Date Company Agency Name Project Preference
10/18/2023 KGA City of Las Vegas, Public Works Durango Hills Senior Center Addition Feasibility Study No
Description: Provide architectural services for the Durango Hills Senior Center Addition Feasibility for the City of Las Vegas.

 

Date Company Agency Name Project Preference
10/18/2023 Westar Architects City of Las Vegas Public Works Fire Administration Restrooms Remodel No
Description: Architectural services for the remodel of the Fire Administration Restroom for the City of Las Vegas.

 

Date Company Agency Name Project Preference
10/18/2023 SCA Design City of Las Vegas Public Works Bridging Documents for Skye Canyon/Providence Area LVMPD Community Substation No
Description: Prepare bridging documents for Skye Canyon / Providence Area LVMPD Community Substation and Park for the City of Las Vegas.

 

Date Company Agency Name Project Preference
10/10/2023 CWX Architects Inc. Washoe County School District Multiple Sites
Description: Roll down fire doors design for replacement of roll down fire doors.

 

Date Company Agency Name Project Preference
10/5/2023 LGA Architecture City of Las Vegas Public Works Centennial Hills Active Adult Center Addition and Upgrades No
Description: Design services to include expanding the existing Centennial Hills Active Adult Center with approximately 5,000 square feet of multi-purpose space.

 

Date Company Agency Name Project Preference
9/29/2023 TSK Architects Washoe County School District Vaughn
Description: Construction Documents for bidding and construction, permits phase 1 bidding, phase 2 bidding, phase 1 CA, phase 2 CA contingency.

 

Date Company Agency Name Project Preference
9/26/2023 Architects Plus Washoe County School District Reed HS
Description: Provide complete sign services for the demo and replacement of the existing large gym floor bleachers and small gym floor removal and replacement of entryway floor in small gym. CA for project included.

 

Date Company Agency Name Project Preference
9/26/2023 JK Architecture Washoe County School District McQueen HS & NVHS
Description: Provide complete design services for the classroom ADA upgrades required CTE quality program review summary report dated 121/5/2020. CA is included.

 

Date Company Agency Name Project Preference
9/18/2023 Dube Group Washoe County School District NVHS / Alice Smith
Description: Replace the interior/exterior lock hardware Provide base drawings conduct field investigation develop bid docs and cost estimates.

 

Date Company Agency Name Project Preference
9/7/2023 Architects Plus LLC Washoe County School District Caughlin Ranch ES
Description: Design bid drawings for exterior painting and sealing of the school building.

 

Date Company Agency Name Project Preference
9/7/2023 Architects Plus LLC Washoe County School District Lois Allen Es
Description: Design bid drawings for exterior painting and sealing of the school building.

 

Date Company Agency Name Project Preference
9/7/2023 Architects Plus LLC Washoe County School District Esther Bennett ES
Description: Design bid drawings for exterior painting and sealing of the school building.

 

Date Company Agency Name Project Preference
8/23/2023 Banneker Architecture City of Las Vegas Public Works Fire Station No. 42 Kitchen Remodel No
Description: Provide archtiectural services for the design of Fire Station No. 42 remodel for the city of Las Vegas.

 

Date Company Agency Name Project Preference
8/14/2023 Tate, Snyder, Kimsey Architects Clark County, Real Property Mangement Maslow Park New Fire Station #62 No
Description: New 11,000 square foot fire station with three apparatus bay and staff areas. Includes demoltion of existing site amenities.

 

Date Company Agency Name Project Preference
7/11/2023 H & K Architects Washoe County School District Stead ES
Description: Provide complete architectural and engineering design services to convert existing boiler room into office.

 

Date Company Agency Name Project Preference
5/24/2023 Architects Plus LLC Washoe County School District Admin Bldg
Description: Single point of entry upgrades at admin. Provide design through CA services based on Sheme 2 from feasibility study

 

Date Company Agency Name Project Preference
4/20/2023 Tate Snyder Kimsey Architects City of Reno - Public Works Reno Fire Department Central Station No
Description: Architectural design services for a new fire station headquarters.

 

Date Company Agency Name Project Preference
3/29/2023 TSK Architects City of Henderson Public Works Justice Facility Interior Design Improvements No
Description: Update interior finishes and provide minor construction. Includes replacing interior finishes in both public and office space areas and minor construction to improve inefficiencies and incorporate future staff needs.

 

Date Company Agency Name Project Preference
3/21/2023 Carpenter Sellers Del Gatto Architect City of Henderson, Public Works Fire Station 92
Description: New fire station with 4 apparatus bays, crew dorms, crew offices and support spaces.

 

Date Company Agency Name Project Preference
2/27/2023 Richardson Wetzel Architects, LLC City of Las Vegas Public Works Floyd Lamb Historic Building Restoration No
Description: Preparation of Feasibliity Study for Floyd Lamp Park - Historic Building Restoration for the City of Las Vegas.

 

Date Company Agency Name Project Preference
2/27/2023 KME Architects, LLC City of Las Vegas Public Works Miller Avenue Fire House - Condition Assessment No
Description: Feasibility Study for Miller Avenue Fire House - Condition Assessment for City of Las Vegas.

 

Date Company Agency Name Project Preference
2/27/2023 Knit City of Las Vegas Public Works Health and Wellness Center - Bonanza/Legion (Ward 3) No
Description: Architectural services for the design of the Health and Wellness Center - Bonanza/Legion (Ward 3) project for the CIty of Las Vegas.

 

Date Company Agency Name Project Preference
2/24/2023 Van Woert Bigotti Washoe County School District Debbie Smith CTE
Description: Conceptual master plan design fees.

 

Date Company Agency Name Project Preference
2/8/2023 TSK Architects Carson City Public Works Carson City Courthouse Expansion No
Description: Space planning options for the Carson City Courthouse expansion project.

 

Date Company Agency Name Project Preference
2/1/2023 Carpenter Sellers Del Gatto Architects City of Henderson Public Works Fire Station 81 Renovation No
Description: The renovation and addition to the existing fire station. The renovation will include the expansion of the existing dorm rooms, day room, kitchen, gym, and kitchen.

 

Date Company Agency Name Project Preference
1/18/2023 H & K Architects Washoe County School District Clayton MS
Description: Construction Admin Services for area L roof replacement and seismic improvements

 

Date Company Agency Name Project Preference
1/18/2023 Dube Group Architecture Washoe County School District Various Braille Signs
Description: Braille upgrades at 10 sites. Design and bid phase services to upgrade braille signs at 10 sites.

 

Date Company Agency Name Project Preference
1/18/2023 TSK Architects Washoe County School District New Vaughn
Description: Rebuild programming, schematic design, design development, reimburseables

 

Date Company Agency Name Project Preference
1/3/2023 Tate Snyder Kimsey Architects, Ltd. dba TSK Architects Clark County, Real Property Management Regional Justice Center - LRP Space Planning Improvements (Steps 1-21) No
Description: Professional services for project administration, design, CMAR RFP selection process, bid assistance, permit assistance, and construction administration.

 

Date Company Agency Name Project Preference
1/3/2023 Welles Pugsley Architects, LLC dba Simpson Coulter Studio Clark County, Real Property Management Logandale Sports Complex, Phase II Improvements No
Description: Professional services to provide project administration, pre-design, site analysis, design, bidding assistance, permitting assistance, and construction administration services for Phase II park improvements.

 

Date Company Agency Name Project Preference
12/29/2022 Olivo Architecture, PC City of Las Vegas, Public Works Fire Station #4 Restroom Remodel No
Description: Design and/or construction of Fire Station #4 restroom remodel for the City of Las Vegas.

 

Date Company Agency Name Project Preference
12/16/2022 TSK Architects Washoe County School District North Valleys HS
Description: Paint/seal windows and door frames throughout the exterior. Architects will prepare code compliant drawings and documents required for permitting bidding and construction.

 

Date Company Agency Name Project Preference
12/16/2022 H & K Architects Washoe County School District Stonebrook
Description: Stonebrook area ES Design - Professional architecture design services

 

Date Company Agency Name Project Preference
12/5/2022 Aptus City of Las Vegas Public Works DPS - D&E Unit 5 & 6 Restroom Addition No
Description: Architectural services for the design and/or construction of the DPS - D&E Unit 5 & 6 Restroom for the City of Las Vegas.

 

Date Company Agency Name Project Preference
11/18/2022 Simpson Coulter City of Las Vegas Public Works Expansion to the 9th / Bridger Charter School No
Description: Architectural services for the design and/or construction for the expansion to the 9th / Bridger Charter School project for the City of Las Vegas.

 

Date Company Agency Name Project Preference
11/18/2022 Leo A Daly City of Henderson Public Works Fire Station 95 Renovation No
Description: The renovation and addition to the existing fire station. The renovation will include the expansion of the existing dorm rooms, day room, kitchen, gym, and BC suite.

 

Date Company Agency Name Project Preference
11/15/2022 Architects Plus Washoe County School District Elmcrest and Anderson
Description: Single point of entry. Provide design, bid and CA.

 

Date Company Agency Name Project Preference
11/14/2022 Architects Plus Washoe County School District Depoali MS
Description: Single point of entry upgrades. Provide design bid and CA for single point of entry upgrades.

 

Date Company Agency Name Project Preference
11/14/2022 H & K Architects Washoe County School District Clayton MS
Description: Emergency temporary shoring of courtyard columns. Provide architectural + structural design services to provide temp shoring for deteriorated courtyard columns, bid assistance and construction admin.

 

Date Company Agency Name Project Preference
11/14/2022 Architects Plus Washoe County School District Mt Rose ES
Description: Single point of entry upgrades. Provide design bid and CA for single point of entry upgrades.

 

Date Company Agency Name Project Preference
11/1/2022 Architects Plus Washoe County School District Admin Bldg
Description: Single Point of Entry Upgrades at Administration PO Scope: Arch Plus to provide feasibility study for options of entry security improvements at Administration building.

 

Date Company Agency Name Project Preference
10/21/2022 Collaborative Design Studio Washoe County School District Admin Bldg
Description: Architects basic services

 

Date Company Agency Name Project Preference
10/12/2022 CWX Architects Washoe County School District Damonte Ranch
Description: Design removal of restroom counter tops, replace with wall mounted sinks, replace all cabinets in art classroom.

 

Date Company Agency Name Project Preference
10/4/2022 Architects Plus Washoe County School District Winnemucca ES
Description: Provide complete design and construction admin for re-painting and re-sealing of the exterior of ES.

 

Date Company Agency Name Project Preference
10/4/2022 Architects Plus Washoe County School District Van Gorder ES
Description: Provide complete design and construction admin for re-painting and re-sealing of the exterior.

 

Date Company Agency Name Project Preference
9/28/2022 Architects Plus Washoe County School District Donner Springs ES
Description: Provide soffit repairs painting and sealing exterior of building. Provide design bid/construction drawings and construction admin.

 

Date Company Agency Name Project Preference
9/28/2022 Architects Plus Washoe County School District Hunsberger ES
Description: Provide design, bid/construction drawings, and construction admin for painting and sealing of school.

 

Date Company Agency Name Project Preference
9/27/2022 PGAL, LLC City of Las Vegas, Public Works Centennial Hills Community Center Indoor/Outdoor Pool No.
Description: Architectural services for the design and/or construction for the Centennial Hills Community Center Indoor/Outdoor Pool Improvements for the City of Las Vegas.

 

Date Company Agency Name Project Preference
9/22/2022 H & K Architects Washoe County School District Talus Valley HS
Description: Provide pre design/conceptual design services for the Talus Valley development HS site.

 

Date Company Agency Name Project Preference
9/16/2022 LGA Architecture City of Las Vegas Public Works Charleston Heights Arts Center No
Description: Stage and theatrical design for the Charleston Heights Arts Center for the City of Las Vegas.

 

Date Company Agency Name Project Preference
9/14/2022 Dube Group Architects Washoe County School District SSES
Description: Door hardware upgrades. Design and bid phase services to replace door locks throughout facility that are not keymark keyed or current WCSD hardware standard.

 

Date Company Agency Name Project Preference
9/14/2022 Dube Group Architects Washoe County School District Winnemucca ES
Description: Door hardware upgrades. Design and bid phase services to replace door locks throughout facility that are not keymark keyed or current WCSD hardware standard.

 

Date Company Agency Name Project Preference
9/9/2022 CWX Architects Washoe County School District Damonte Ranch HS
Description: Vestibule replacement and paint/repair windows and door frames. Architect will prepare code compliant drawings and documents required for permitting, bidding and construction.

 

Date Company Agency Name Project Preference
9/9/2022 CWX Architects Washoe County School District Innovations HS
Description: Provide design and construction documents and CA for improvements to the high school.

 

Date Company Agency Name Project Preference
9/9/2022 Dube Group Architects Washoe County School District Allen ES
Description: Drywall cracking investigation at Lois Allen DGA to provide design field investigation during construction findings reporting of cracking causation and construction admin.

 

Date Company Agency Name Project Preference
8/24/2022 TSK Architects City of Las Vegas Public Works Lorenzi Park Tennis Court Expansion No
Description: Architectural services for the design of Lorenzi Park Tennis Court Expansion for the City of Las Vegas.

 

Date Company Agency Name Project Preference
7/21/2022 NOVUS Architecture City of Las Vegas Public Works Fremont Street Las Vegas Metropolitan Police Department, Department of Public Safety, and Fremont Street East Security Operations Center No
Description: Architectural services for the design of Fremont Street Las Vegas Metropolitan Police Department, Department of Public Safety, and Fremont Street East Security Operations Center project.

 

Date Company Agency Name Project Preference
7/20/2022 TSK Architects Clark County Real Property Management RJC Phased Tenant Improvements No
Description: Relocate staff to the RJC and Clark Place building, build out 16 new courtrooms and modify 4 courtrooms within the RJC.

 

Date Company Agency Name Project Preference
7/6/2022 Collaborative Design Studios Washoe County School District Central Transportation
Description: Architecture Design services for modernization of bus yard, including sub consultants (no CA).

 

Date Company Agency Name Project Preference
6/22/2022 H & K Architects Washoe County School District Reno HS
Description: Seismic and roofing assessment science and cafeteria buildings

 

Date Company Agency Name Project Preference
6/22/2022 H & K Architects Washoe County School District Veterans ES
Description: Architecture construction administration services for Veterans seismic project phase 2 building A

 

Date Company Agency Name Project Preference
6/22/2022 Collaborative Design Studio Washoe County School District Incline HS
Description: Design fees for track and field replacement and building expansion (Duffield Funded) include CA

 

Date Company Agency Name Project Preference
4/6/2022 H & K Architects Washoe County School District Clayton MS
Description: Provide architectural structural design services to verify existing conditions, create demolition drawings, create repair design drawings, permit assistance, and bid assistance.

 

Date Company Agency Name Project Preference
4/5/2022 Collaborative Design Studio Washoe County School District Central Transportation (Kleppe Lane)
Description: Pre-Design and Programming for redesign/expansion of the transportation site.

 

Date Company Agency Name Project Preference
3/31/2022 Architects Plus Washoe County School District Diedrichesen
Description: HVAC screen design

 

Date Company Agency Name Project Preference
3/11/2022 KME Architects, LLC City of Las Vegas Public Works Doolittle Community Center Campus Master Plan No
Description: Architectural services for the Doolittle Community Center Campus Master Plan for the City of Las Vegas.

 

Date Company Agency Name Project Preference
2/24/2022 KGA Architecture City of Las Vegas Public Works Fire Training Center Rehab, Phase 2 No
Description: Architectural services for the Fire Training Center Rehab, Phase 2 project for the City of Las Vegas.

 

Date Company Agency Name Project Preference
1/28/2022 Van Woert Biogotti City of Reno - Public Works Moana Springs Community Aquatics and Fitness Center No
Description: VWB engaged for design of new community pool and fitness center for the City of Reno.

 

Date Company Agency Name Project Preference
1/26/2022 Jeff Katz Carson City Public Works Carson City Fire Station Assessment No
Description: Jeff Katz has been hired to provide assessment services on the living spaces at the City's fire stations in town.

 

Date Company Agency Name Project Preference
1/24/2022 BJG Architecture + Engineering City of Sparks Space planning assessment for the Sparks PD Training Building No
Description: This is a planning project to determine the size and scope of a planned new training building at the Sparks Police Department.

 

Date Company Agency Name Project Preference
1/20/2022 H & K Architects Washoe County School District Clayton MS
Description: Design services for the area L roof replacement and seismic improvements.

 

Date Company Agency Name Project Preference
1/11/2022 Collaborative Design Studio Washoe County School District Incline HS
Description: Feasibility and scoping study for potential capital project to include new fields and student hub.

 

Date Company Agency Name Project Preference
12/20/2021 TSK Architects Carson City Public Works Design Services for Fire Station with Shared Facilities No
Description: TSK to assist Carson City with programming and conceptual design of a new fire station with shared facility components.

 

Date Company Agency Name Project Preference
11/4/2021 Architects Plus Washoe County School District, Capital Projects Vaughn MS Gym Floor NO
Description: Design gym floor replacement and design floor room 48A

 

Date Company Agency Name Project Preference
11/4/2021 JK Architecture Engineering Washoe County School District, Capital Projects Incline ES NO
Description: Project includes existing fascia & rain gutter visual assessment, repair design & paint/stain specifications, design docs for the painting of existing fascia, trim and eves on exterior of school.

 

Date Company Agency Name Project Preference
9/23/2021 Architects Plus Washoe County School District, Capital Projects Verdi ES Storefront NO
Description: Provide construction admin services for new storefront windows

 

Date Company Agency Name Project Preference
9/22/2021 RAFI City of Henderson, Public Works Clark County Justice Courtroom Dept. 4 Remodel NO
Description: Interior remodel/upgrade of finishes and furniture in an existing courtroom. Includes new paint, ceiling treatment, carpet, millwork, lighting, and power/data modifications.

 

Date Company Agency Name Project Preference
9/16/2021 Dube Group Washoe County School District, Capital Projects Desert Heights NO
Description: Provide complete design drawings for replacing of exterior/interior door hardware

 

Date Company Agency Name Project Preference
9/16/2021 Architects Plus Washoe County School District, Capital Projects Various Sites NO
Description: Provide design services for construction docs for single point of entry at 12 sites, CA

 

Date Company Agency Name Project Preference
9/14/2021 Knit City of Las Vegas, Public Works Doolittle Senior Center Improvements NO
Description: Architectural Services for the design and construction of the Doolittle Senior Center Improvements project for the City of Las Vegas.

 

Date Company Agency Name Project Preference
9/14/2021 Dube Group Architecture Carson City Public Works Wastewater Treatment Facility Bathroom Remodel Design NO
Description: Remodel the existing women and men's restrooms in the Wastewater Treatment Facility. Will add an additional stall for the women's restroom revising the area from the men's restroom and incorporate the latest building codes and ADA requirements as necessary.

 

Date Company Agency Name Project Preference
9/13/2021 Architects Plus Washoe County School District, Capital Projects Moss ES NO
Description: Repair/replace all damaged areas of exterior soffit and drip edges along entire exterior of building. Provide drawings, bid assistance and oversight.

 

Date Company Agency Name Project Preference
9/13/2021 CWX Architects Washoe County School District, Capital Projects Damonte HS NO
Description: Paint all exterior windows and doors. Provide drawings for bidding, bid assistance, lead/asbestos sheets, CA

 

Date Company Agency Name Project Preference
9/13/2021 CWX Architects Washoe County School District, Capital Projects Damonte Ranch HS NO
Description: Replace two storefronts, provide drawings, bid assistance and CA

 

Date Company Agency Name Project Preference
9/8/2021 Dennis Panars, AIA, EDAC, NCARB; Knit Designing Community City of Henderson, Public Works City of Henderson Municipal Jury Courtroom Remodel NO
Description: Remodel of two existing courtrooms, One will become a jury services room and other will remain a courtroom, but will be remodeled to make adequate room for a jury box, complaint witness stand, and updated fixtures and finishes.

 

Date Company Agency Name Project Preference
8/11/2021 Bunnyfish City of Las Vegas, Public Works Floyd Lamb Park Restroom NO
Description: This Project will create a new restroom within the Floyd Lamb Park Hay Barn for the City of Las Vegas

 

Date Company Agency Name Project Preference
7/15/2021 Carpenter Sellers Del Gatto City of Las Vegas, Public Works Police Memorial Park NO
Description: Design of Police Memorial Park of the City of Las Vegas

 

Date Company Agency Name Project Preference
6/30/2021 H+K Architects Public Works Carson City Fleet Services NO
Description: H+K Architects will be providing design services for a new tire and welding shop located in the Carson City Public Works Corporate Yard.

 

Date Company Agency Name Project Preference
6/24/2021 Dube Group Architecture Carson City - Parks Mills Park Maintenance Shop-Architectural Services No
Description: Architectural services for the design and construction of the Mills Park Maintenance Shop.

 

Date Company Agency Name Project Preference
6/17/2021 Aptus Group City of Henderson, Public Works Center for Excellence No
Description: A City of Henderson staff office facility of approximately 20,000sf with tenant lease space for industry partnerships.

 

Date Company Agency Name Project Preference
5/27/2021 H & K Architects Washoe County School District Incline HS
Description: Design for elevator panel replacement on the exterior of the elevator addition.

 

Date Company Agency Name Project Preference
4/29/2021 Leo A Daly City of Henderson Public Works New crime lab No
Description: New 20,000 state-of-the-art crime lab with laboratory space, evidence vault and storage space, office and support spaces, and secured parking/vehicle evidence processing area.

 

Date Company Agency Name Project Preference
4/29/2021 LGA Architecture City of Henderson Public Works Silver Springs Recreation Center Renovation No
Description: Partial demo and renovation of an existing 36,600 facility including site modifications.

 

Date Company Agency Name Project Preference
3/18/2021 PGAL, LLC City of Henderson, Public Works Via Inspirada Police Station No
Description: A new police station to include patrol substation, cadet training academy, and 911 call center located on the southeast corner of Via Inspirada and Via Nobila.

 

Date Company Agency Name Project Preference
2/5/2021 H & K Architects Washoe County School District Spanish Springs HS
Description: Professional services for design bid set drawings to mitigate water infiltration within the existing hollow metal window frame assemblies and Construction Admin.

 

Date Company Agency Name Project Preference
2/3/2021 Arrington Watkins Architects Las Vegas Convention Visitors Authority LVMPD Area Command Expansion Project No
Description: Expansion of existing police office building and associated parking.

 

Date Company Agency Name Project Preference
1/27/2021 PGAL, LLC City of Las Vegas - Public Works Health & Wellness - Jackson Avenue No
Description: Architectural services for the design and construction of the Health & Wellness - Jackson Avenue project for the City of Las Vegas.

 

Date Company Agency Name Project Preference
1/25/2021 H & K Architects City of Sparks Maintenance Bullpen Restroom Addition No
Description: This project will create a new restroom and shower within the City of Spark Maintenance Building.

 

Date Company Agency Name Project Preference
1/25/2021 H & K Architects Carson City Public Works Carson City Juvenile Services Facility Needs Assessment No
Description: H & K Architects will be providing Carson City Juvenile Services with a facility needs assessment. The facility is outdated and is in need of upgrades in order to better operate the facility and bring the facility into compliance.

 

Date Company Agency Name Project Preference
1/12/2021 TSK Architects Incline Village GID, Public Works Dept. Burnt Cedar Beach Swimming Pools Improvement Project No
Description: Replacement of a swimming pool and toddler pool at Burnt Cedar Beach in Incline Village, NV.

 

Date Company Agency Name Project Preference
12/24/2020 H & K Architects Washoe County School District Stonebrook ES
Description: Conceptual site plan / study for potential elementary school at Stonebrook Development.

 

Date Company Agency Name Project Preference
12/9/2020 MBA Architecture & Interior Design City of Reno Fire Station 6 &10 Dormitory Remodel No
Description: Tenant improvements to separate large open dormitory into individual sleeping quarters to help with reduction in the spread of viruses from firefighter to firefighter.

 

Date Company Agency Name Project Preference
10/20/2020 Carpenter Sellers Del Gatto City of Las Vegas Public Works Regional Aquatic Center at Pavillion Pool No
Description: Design of regional aquatic center at Pavillion Pool for the ICty of Las Vegas.

 

Date Company Agency Name Project Preference
10/20/2020 Simpson Coulter CIty of Las Vegas Public Works Regional Adaptive Community Center No
Description: Design of regional adaptive community center for the City of Las Vegas.

 

Date Company Agency Name Project Preference
9/24/2020 Architects Plus Washoe County School District Smithridge ES
Description: Construction admin for sofit replacement.

 

Date Company Agency Name Project Preference
9/23/2020 H & K Architects Washoe County School District Veterans ES
Description: Professional architecture and engineering design services for seismically upgrading buildings B and C. Ca included per proposal.

 

Date Company Agency Name Project Preference
9/4/2020 Knit William Bee Ririe Hospital William Bee Ririe Clinic Re-model
Description: We will be remodeling existing clinic space to increase number of exam rooms, Doctor offices and increased waiting room size. Such changes will allow for better separation of "sick" and "well" patients reducing risk of COVID-19 spread, project will also allow for the accommodation of more specialists to see patients.

 

Date Company Agency Name Project Preference
9/3/2020 CWX Architects Washoe County School District Silver Lake ES
Description: Replace windows, provide scope and drawings. Assist with bidding.

 

Date Company Agency Name Project Preference
9/1/2020 CWX Architects Inc. Washoe County School District Echo Loder ES
Description: Provide 30% and 90% drawings for internal review that includes cost estimates, revising the drawings per any notes from review. Provide lead/asbestos sheet based on the testing results and notes provided by ESA, as well as place the MDP's on the drawings for permit. Provide bidding assistance.

 

Date Company Agency Name Project Preference
9/1/2020 CWX Architects Inc. Washoe County School District Melton ES
Description: Provide 30% and 90% drawings for internal review that includes cost estimates, revising the drawings per any notes from review. Provide lead/asbestos sheet based on the testing results and notes provided by ESA, as well as place the MDP's on the drawings for permit. Provide bidding assistance.

 

Date Company Agency Name Project Preference
8/13/2020 Tate Snyder Kimsey Washoe County School District Mount Rose ES
Description: Provide Ca on Stucco Paint project. Consisted of punch list and closeout.

 

Date Company Agency Name Project Preference
3/11/2020 Hooft Architecture LLC Washoe County School District Wooster HS
Description: Update MDP sheets with information provided by WCSDE. Revise the list of referenced building codes to current versions. Remove reference to alternate details. Remove beam tails detail revise notes on sheets graphically make courtyard light locations more prominent.

 

Date Company Agency Name Project Preference
3/10/2020 LG Architects, Inc. dba LGA City of Las Vegas Pubilc Works Northwest Regional Park No
Description: Parks and landscape design for Northwest Regional Park for the City of Las Vegas.

 

Date Company Agency Name Project Preference
2/19/2020 Hooft Architecture LLC Washoe County School District Veterans ES
Description: Provide revisions and clarifications for old drawings. This project was previously bid twice with no interest from contractors.

 

Date Company Agency Name Project Preference
2/19/2020 TSK Architects Washoe County School District O'Brien MS
Description: Architectural design services working with a construction manager @ risk

 

Date Company Agency Name Project Preference
2/14/2020 BJG Archtiecture and Engineering City of Sparks Fire Station #6 Study No
Description: Study design concepts and cost for a potential Fire Station #6 in Spanish Springs.

 

Date Company Agency Name Project Preference
2/13/2020 JMA Architects City of Las Vegas Public Works Blanket Contract - Staff Augmentation for Architectural Services No
Description: Staff augmentation for architectural services for the City of Las Vegas.

 

Date Company Agency Name Project Preference
2/13/2020 BJG Architecture and Engineering City of Sparks Fire Station #6 Study No
Description: Study design concepts and cost for a potential Fire Station #6 in Spanish Springs

 

Date Company Agency Name Project Preference
2/6/2020 Van Woert Bigotti Washoe County School District Hug HS CTE
Description: Ed spec development, visioning educational planning, synthesis space planning, Pre-design, As Built review, concept exploration, Cost Prediction, Exploratory trips, cost review renderings & video animation

 

Date Company Agency Name Project Preference
2/6/2020 Dube Group Architecture Washoe County School District Clayton MS
Description: Architectural design, CA services to stabilize and repaint exterior. Provide new design for building screen and railing system, Electrical Engineering, Landscape Design, Food Services design and theatre Design

 

Date Company Agency Name Project Preference
1/31/2020 H & K Architects Washoe County School District Wild Creek HS
Description: Construction administration, architectural design/project management, civil engineering, structural engineering, mechanical engineering, electrical engineering, landscape design, food service design and theater design.

 

Date Company Agency Name Project Preference
1/30/2020 H & K Architect Washoe County School District Rio Wrangler ES
Description: Traffic study, schematic design, design development, construction documents, bid/negotiation, construction admin.

 

Date Company Agency Name Project Preference
1/30/2020 MBA Architecture + lnterior Design City of Reno - Public Works Public Safety Center No
Description: This award is for design and construction administration services for the improvements necessary to renovate the property at 955 Kuenzli St to be the Reno Police Department's new Public Safety Center.

 

Date Company Agency Name Project Preference
1/22/2020 Dube Group Architecture Carson City Public Works Building B Remodel Design No
Description: Design services for remodeling Public Works Building B.

 

Date Company Agency Name Project Preference
11/20/2019 TSK Washoe County School District O'Brien MS
Description: Phase 1- explore and research opportunities and risks with rebuild replacement concept, provide conclusions and recommendations.

 

Date Company Agency Name Project Preference
11/12/2019 Formgrey City of Sparks, Community Services Dept. Sparks PD Dispatch Remodel No
Description: This is for the architectural design to remodel the dispatch center at the Sparks Police Department.

 

Date Company Agency Name Project Preference
11/12/2019 Formgrey City of Sparks, Community Services Dept. Tenant Improvements for Fire Stations #1 and #2
Description: Remodel of office and dorm areas within Fire Station #1 and #2.

 

Date Company Agency Name Project Preference
11/12/2019 Formgrey City of Sparks, Community Services Dept. Sparks Legislative Building Dian Upgrade Project
Description: This is for the Architectural design to install bullet resistance to the Dias and explore ADA options for the Sparks Legislative Building.

 

Date Company Agency Name Project Preference
11/12/2019 Formgrey City of Sparks, Community Services Dept. Sparks City Hall/Maintenance Bldg. Painting Project
Description: The architect will provide visual elevations for paint colors and Sparks Emblem along with fascia details if required.

 

Date Company Agency Name Project Preference
11/12/2019 Formgrey City of Sparks, Community Services Dept. Sparks City Hall Remodel Project
Description: Remodel of various areas throughout the Sparks City Hall, including ADA upgrade of an existing restroom.

 

Date Company Agency Name Project Preference
10/14/2019 Design Workshop Carson City Public Works Downtown Redevelopment Design Concepts No
Description: Design workshop has been hired to develop sidewalk and landscape improvements that can be completed in the downtown area to match the theme of Carson St.

 

Date Company Agency Name Project Preference
10/8/2019 Architects + LLC Washoe County School District Sparks MS Soffit Replacement
Description: Plans, specs and construction admin for soffit replacement

 

Date Company Agency Name Project Preference
9/23/2019 Colaborative Design Studio Washoe County School District Billinghurst, Mendive, and Shaw MS Expansion Feasibility Studies
Description: Design services to study expansion possibilities at existing Billinghurst, Mendive and Shaw Middle School. Capacity expansion, Middle Ed Spec Reconciliation, existing classroom and facility revitalization.

 

Date Company Agency Name Project Preference
9/23/2019 TSK Architects Washoe County School District O'Brien Replacement Architectural Concept Refinement and Public Mtgs
Description: Architectural Concept Design Refinement, Reorient Plan with Gym adjacent to athletic fields, Redesign site circulation to show traffic flow, Develop presentation materials, Public review meetings

 

Date Company Agency Name Project Preference
9/20/2019 The Dube Group Architecture Carson City Public Works Well 3 Pump House Design No
Description: Design of a new pump house and site generator for Carson City's Municipal Well 3.

 

Date Company Agency Name Project Preference
7/17/2019 Stantec Consulting Services Truckee Meadows Water Authority Lightning W Tank #2 No
Description: Landscape architecture design

 

Date Company Agency Name Project Preference
7/8/2019 Architects Plus Washoe County School District Swope Revite
Description: Design, engineering, construction administration and project closeout for the expansion and renovation.

 

Date Company Agency Name Project Preference
6/13/2019 Carpenter Sellers Del Gatto Architects City of Henderson, Public Works City Hall Cafe and Collaboratory No
Description: Renovation of existing breakroom/cafe space and redesign and expansion of the Collaboratory (a space for collaboration utilizing technology and furniture for various group sizes).

 

Date Company Agency Name Project Preference
6/13/2019 Broyles International, LLC dba IZ Design Studio City of Henderson, Public Works Arroyo Grande Sports Offices Addition No
Description: Building addition with office, conference room, breakroom, public lobby and public restroom.

 

Date Company Agency Name Project Preference
5/31/2019 TSK Architect Washoe County School District Lemon Valley Ceiling
Description: Construction Admin for Lemmon Valley Ceiling project

 

Date Company Agency Name Project Preference
5/29/2019 J.R. ROMERO ARCHITECT Washoe County School District Attic access various schools
Description: Update the existing plans to show newly adopted codes from jurisdiction (2018). Place updated WCSD MDP's into the drawings. Re-make PDFs of all drawings, print six sets of each, stamp and sign; also print four for WCSD use.

 

Date Company Agency Name Project Preference
5/24/2019 TSK Architects Washoe County School District WCSD Existing Facilities Condition Reports
Description: Provide analysis and soring evaluations for O'Brien Stem and Swope Middle School. To include criteria, deliverables, schedules

 

Date Company Agency Name Project Preference
5/2/2019 JK Architecture Washoe County School District 2020 ADA Compliance Billinghurst MS
Description: Provide Complete design for ADA restroom/drinking fountain upgrades throughout school

 

Date Company Agency Name Project Preference
4/30/2019 H+K Architects Washoe County School District Wild Creek HS Design
Description: A & E construction documents/bidding

 

Date Company Agency Name Project Preference
4/23/2019 George Rogers Architect City of Las Vegas Architecture Blanket Agreement No
Description: Blanket agreement for architectural services for the City of Las Vegas.

 

Date Company Agency Name Project Preference
4/17/2019 Architects Plus LLC Washoe County School District Cost Estimates and proposed construction schedules
Description: Prepare drawings and respond to review questions from AHJ. Provide bid assistance and some CA duties.

 

Date Company Agency Name Project Preference
4/17/2019 Architects Plus LLC Washoe County School District Cost estimates and proposed construction schedules
Description: Architectural services in window replacement.

 

Date Company Agency Name Project Preference
2/1/2019 Simpson Coulter Studio City of Las Vegas Strong Start Academy of Wardelle No
Description: New child care facility with health center to have a separate entrance in Las Vegas, NV.

 

Date Company Agency Name Project Preference
1/18/2019 Hooft Architecture, LLC Truckee Meadows Water Authority TMWA Refueling Site NO
Description: TMWA Refueling Site

 

Date Company Agency Name Project Preference
12/11/2018 Hooft Architecture, LLC Truckee Meadows Water Authority TMWA Vehicle Maintenance Facility No
Description: Feasibility study

 

Date Company Agency Name Project Preference
12/3/2018 LG Architects, Inc., dba LGA City of Las Vegas Public Works Northwest Regional Park No
Description: Conceptual design of 100-acre site to share with Clark County School District and City of Las Vegas. Campus will have various park elements, a high school, potential library and other shared amenities.

 

Date Company Agency Name Project Preference
11/14/2018 Tate Snyder Kimsey Architects Washoe County School District Core School Investment Analysis
Description: Architectural services for the feasibility study service to understand capacity expansion, equity improvements and existing facility renovations.

 

Date Company Agency Name Project Preference
11/1/2018 Carpenter Sellers Del Gatto Architects City of Henderson, Public Works Fire Station 85 at Hidden Falls NO
Description: A new fire station, based on the City's prototype previously developed by Carpenter Sellers Del Gatto Architects, consisting of living quarters, apparatus bay, offices and training room located at Horizon Drive and Horizon Ridge Parkway.

 

Date Company Agency Name Project Preference
10/10/2018 Frame Architecture Washoe County School District Program Administration NO
Description: Professional services to provide construction documents for two --phase remodel.

 

Date Company Agency Name Project Preference
10/5/2018 Dube Group Architect Washoe County School District Proposal for Architectural Svcs. Door Hardware Replacement NO
Description: Door hardware replacement for Teed High School interior/exterior doors.

 

Date Company Agency Name Project Preference
8/15/2018 Architects + LLC Washoe County School District Feasibility Study for Core School Improvements No
Description: Swope MS Core school improvement, scoping/feasibility study. Proposal for architectural design services.

 

Date Company Agency Name Project Preference
8/15/2018 Collaborative Design Studio Washoe County School District Feasibility Study for Core School Improvements NO
Description: McQueen HS Core school improvement, scoping/feasibility study. Proposal for architectural design services.

 

Date Company Agency Name Project Preference
7/19/2018 H+K Architects Washoe County School District Conceptual Site Planning NO
Description: Cold Springs MS conceptual site planning.

 

Date Company Agency Name Project Preference
7/6/2018 Architect Plus Washoe County School District Safety and Security NO
Description: Single Point Construction

 

Date Company Agency Name Project Preference
7/2/2018 Van Woert Bigotti Architects Washoe Count School District Single Point Entries No
Description: Scope and Fee Proposal for sigle Point Entries-Angela Bigotti-Chavez #3675

 

Date Company Agency Name Project Preference
5/29/2018 Architects + LLC Washoe County School District O'Brien Middle School No
Description: O'Brien Middle School Caulking Project - professional architectural design services including construction documents, bid and permitting assistance, and construction administration for the window panels

 

Date Company Agency Name Project Preference
5/4/2018 Hershenow & Klippenstein Architects, Inc, Wahoe County School District Stone Gate High School No
Description: professional services for conceptual site design charrette for the proposed Stone Gate High School

 

Date Company Agency Name Project Preference
4/18/2018 Simpson Coulter Studio City of Henderson Hazardous Materials Apparatus Bay No
Description: addition of a new stand-alone bay at Fire Station 98 to house the Hazardous Materials Engine

 

Date Company Agency Name Project Preference
4/17/2018 Sparkflight Studios LLC City of Henderson Water Street District Sign No
Description: new LED sign at the Water Street canopy

 

Date Company Agency Name Project Preference
4/3/2018 GML Architects, LLC Washoe County School District Flooring - FCIS Repairs at Sparks High School No
Description: Additional services for two additional rooms - replacing asbestos containing flooring with new resilient tile and rubber base

 

Date Company Agency Name Project Preference
4/3/2018 KGA Architecture Las Vegas Metropolitan Police Department Las Vegas Metropolitan Police Department Range Building No
Description: architecture services for the new Las Vegas Metropolitan Police Department

 

Date Company Agency Name Project Preference
4/2/2018 LGA City of Las Vegas Corridor of Hope No
Description: A complex that will house and serve the homeless population in downtown Las Vegas. There will be shelter spaces and other amenities provided at the establishment.

 

Date Company Agency Name Project Preference
4/2/2018 Tate, Snyder, Kimsey Architects, Ltd. Washoe County School District Nancy Gomes Elementary School No
Description: Exterior Painting Project

 

Date Company Agency Name Project Preference
2/7/2018 Architects + LLC Washoe County School District Safety and Security No
Description: Dunn ES , Diedrichsen ES, Lenz ES, Dodson ES, Whitehead ES, and Glenn Hare HS - architectural and engineering services for single point of entry design

 

Date Company Agency Name Project Preference
1/25/2018 Architects + LLC Washoe County School District Painting - FCIS Repairs No
Description: Washoe Inspire Academy - architectural and engineering design services to replace existing fascia and soffits with metal clad

 

Date Company Agency Name Project Preference
1/25/2018 Collaborative Design Studio Washoe County School District Safety and Security No
Description: Incline ES - architectural and limited engineering services for Incline ES single point of entry

 

Date Company Agency Name Project Preference
1/25/2018 Architects + LLC Washoe County School District Safety and Security No
Description: Dunn ES, Diedrichsen ES, Lenz ES, Dodson ES, Whitehead ES, and Glen Hare HS - architectural and engineering services fro single point of entry

 

Date Company Agency Name Project Preference
1/23/2018 Hershenow & Klippenstein Architects, Inc. Washoe County School District Wildcreek Design No
Description: Wildcreek HS Design - architectural/engineering services for schematic phase design - approved by BOT on December 12, 2017

 

Date Company Agency Name Project Preference
1/23/2018 Van Woert Bigotti Architects, a Professional Corporation Washoe County School District Arrowcreek Design Services No
Description: Arrowcreeek MS - architectural/engineering design services for new Arrowcreek MS - approved by BOT on January 16, 2018

 

Date Company Agency Name Project Preference
1/23/2018 GML Architects, LLC Washoe County School District Facility Upgrades No
Description: Nutrition Services - construction administration for dry storage and technician office/repair areas

 

Date Company Agency Name Project Preference
1/17/2018 Suzana Rutar, Architect, Ltd., A Professional Corporation City of Las Vegas Public Works Cimarron Rose Room Addition No
Description: provide an additional room to accommodate the growth and capacity of the existing break facility to include additional parking

 

Date Company Agency Name Project Preference
1/9/2018 Architects + LLC Washoe County School District Safety and Security No
Description: Dunn ES, Diedrichsen ES, Dodson ES, and Whitehead ES - provide architectural and engineering services for single point of entry

 

Date Company Agency Name Project Preference
12/20/2017 GML Architects, LLC Washoe County School District Fd40 ADA Bank No
Description: Reed HS - Architectural ADA Assessment of the Reed HS Theater

 

Date Company Agency Name Project Preference
12/20/2017 Architects + LLC Washoe County School District Window Replacement No
Description: Clayton MS - construction administration for window replacement

 

Date Company Agency Name Project Preference
12/18/2017 TVS Nevada, Inc. Las Vegas Convention and Visitors Authority LVCCD Expansion No
Description: Professional services for design of the Las Vegas Convention Center District Expansion (LVCCD)

 

Date Company Agency Name Project Preference
12/14/2017 GML Architects, LLC Washoe County School District ADA FCIS Repairs No
Description: McQueen HS - scope of work to make nurses station/restroom fully ADA compliant

 

Date Company Agency Name Project Preference
10/5/2017 Hershenow and Klippenstein Architects, Inc. Washoe County School District Master Planning No
Description: District Wide Master Planning - perform services to update AIA general conditions with supplementary and special conditions to 2017 version per proposal dated 09/20/2017

 

Date Company Agency Name Project Preference
10/5/2017 Hershenow and Klippenstein Architects, Inc. Washoe County School District HS Master Planning No
Description: HS Master Planning - perform services for Wildcreek area master planning in conjunction with engineering due diligence per proposal dated 10/2/2017

 

Date Company Agency Name Project Preference
9/28/2017 BJG Architecture and Engineering City of Sparks Community Services Municipal Court Space Planning Project No
Description: This project will present options for the City of Sparks Municipal Court Building in making a decision as to stay in its existing building, lease a new building, or lease a building requiring tenant improvements.

 

Date Company Agency Name Project Preference
9/12/2017 Hershenow and Klippenstein Architects, Inc. Washoe County School District Signature Academy No
Description: Sparks HS - construction administration for Sparks HS Robotics Lab

 

Date Company Agency Name Project Preference
9/11/2017 ATA Architecture, LLC City of Henderson Public Works, Parks, and Recreation Fire Station 95 Restroom Renovation No
Description: renovate existing multi-stall restrooms into gender neutral single stall toilet and shower rooms

 

Date Company Agency Name Project Preference
9/11/2017 ATA Architecture, LLC City of Henderson Public Works, Parks, and Recreation Convention Center Fire Riser No
Description: design and construction for a new fire riser (and associated utilities work) and a new pump room

 

Date Company Agency Name Project Preference
9/7/2017 Architects + LLC Washoe County School District Window Replacement No
Description: Clayton MS - design and specifications for window replacement project

 

Date Company Agency Name Project Preference
8/30/2017 Hooft Architecture LLC Washoe County School District Carpentry - FCIS Repairs No
Description: Wooster HS - design services to repair/replace deteriorating exposed wooden beam tails along exterior walkway canopy

 

Date Company Agency Name Project Preference
8/30/2017 Tate Snyder Kimsey Architects, Ltd. Washoe County School District 2018 Painting - FCIS Repair No
Description: Getto Transportation Facility - exterior paint project - proposal includes bidding plans and specifications

 

Date Company Agency Name Project Preference
8/30/2017 Hooft Architecture LLC Washoe County School District Asbestos Abatement No
Description: Veterans ES- design services to abate and replace trasite ceiling

 

Date Company Agency Name Project Preference
8/30/2017 GML - Architecture LLC Washoe County School District Flooring - FCIS Repairs No
Description: Various Schools - flooring replacement

 

Date Company Agency Name Project Preference
8/30/2017 GML - Architecture LLC Washoe County School District ADA Compliance No
Description: Incline HS - professional services for design and construction documents for ADA signage upgrade

 

Date Company Agency Name Project Preference
8/30/2017 GML - Architecture LLC Washoe County School District ADA Compliance No
Description: Galena HS - professional services for design and construction documents for ADA Signage Upgrades

 

Date Company Agency Name Project Preference
8/30/2017 J. R. Romero, Architect Washoe County School District Carpentry - FCIS Repairs No
Description: Spanish Springs ES - Attic Access Improvements

 

Date Company Agency Name Project Preference
8/30/2017 Tate Snyder Kimsey Architects, Ltd. Washoe County School District 2018 Painting - FCIS Repair No
Description: Vaughn MS - exterior painting project - proposal includes bidding plans and specifications

 

Date Company Agency Name Project Preference
8/9/2017 Architects + LLC Washoe County School District Grounds Building Replacement No
Description: Brown Center - professional architectural and engineering services to provide a new ground building at the Brown Center site

 

Date Company Agency Name Project Preference
8/9/2017 J. R. Romero, Architect Washoe County School District Mobiles - FCIS Repairs No
Description: Loder ES, Van Gorder ES, and Sparks HS - extra services required by Regulated Systems and Assessments reissuing out-of-date MDPs to be attached to the drawings for the Portable Residing/Reskirting Project

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Winnemucca ES - design services for flooring replacement

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Lemelson ES - design services for replacement of ceramic tile flooring

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Loeder ES - design services for replacement of sheet vinyl flooring with resilient tile flooring

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: McQueen HS & Glen Hare - professional services for design and construction documents for ADA restroom upgrades

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Galena HS - design services for carpet replacement

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Hug HS - design services for replacement of various flooring

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Sparks HS - design services for ceramic floor tile and carpet over VAT floor replacement

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Wooster HS - design services for replacement of carpet floor tile

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: McQueen HS - design services for resilient floor replacement

 

Date Company Agency Name Project Preference
7/20/2017 Hershenow and Klippenstein Architects, Inc Washoe County School District Signature Academy No
Description: Sparks HS - professional architectural design services for Sparks HS robotics lab and new ADA restrooms

 

Date Company Agency Name Project Preference
7/20/2017 The Dube Group, Architect Washoe County School District Door Hardware Replacement/Upgrade No
Description: Various Schools - professional services for base drawings, conduct field investigations, and develop bid documents for installation of new locks and cylinders to district standard

 

Date Company Agency Name Project Preference
7/20/2017 Architects + LLC Washoe County School District Window Replacement No
Description: Clayton MS - design & specifications for window replacement

 

Date Company Agency Name Project Preference
7/20/2017 Architects + LLC Washoe County School District Window Replacement No
Description: Clayton Ms - construction administration services for window replacement project

 

Date Company Agency Name Project Preference
7/6/2017 Tate Snyder Kimsey Architects, Ltd. Washoe County School District Washoe County School District 2018 Painting FCIS Repair No
Description: Lemmon Valley ES - replace existing acoustical ceilings in 8 classrooms - proposal includes bidding plans & specs

 

Date Company Agency Name Project Preference
6/27/2017 GML Architects, LLC Washoe County School District Nutrition Services Expansion Phase I & II No
Description: Nutrition Service Center - dry storage & technician office/repair areas at nutrition services center

 

Date Company Agency Name Project Preference
6/21/2017 Hooft Architecture LLC Truckee Meadows Water Authority TMWA Pilot Testing Project No
Description: Architectural design and consultant design services

 

Date Company Agency Name Project Preference
6/15/2017 J.R. Romero, Architect Washoe County School District Safety Projects No
Description: Various schools - extra services required by Regulated Systems & Assessment's re-issuing out-of-date MDP's to be attached to the drawings for the attic access improvements at schools having lead-containing paints

 

Date Company Agency Name Project Preference
6/15/2017 J.R. Romero, Architect Washoe County School District Carpentry FCIS Repairs No
Description: Silver Lake ES, Westergard ES, Winnemucca ES, & Van Gorder ES - architectural design services only to improve the safety access to existing attics

 

Date Company Agency Name Project Preference
6/15/2017 J.R. Romero, Architect Washoe County School District Mobile FCIS Repairs No
Description: Spanish Springs ES - construction documents, drawings, and technical specs for re-siding and painting of Spanish Springs ES mobile classroom #613

 

Date Company Agency Name Project Preference
6/15/2017 J.R. Romero, Architect Washoe County School District Mobile FCIS Repairs No
Description: Beasley ES - construction documents, drawings, and technical specs for re-siding and painting of Bud Beasley ES mobile classroom #616

 

Date Company Agency Name Project Preference
5/23/2017 The Dube Group, Architect Washoe County School District Door Hardware Replacement Upgrade No
Description: Damonte Ranch HS - professional engineering services for design of door hardware replacement for exterior and interior doors

 

Date Company Agency Name Project Preference
5/19/2017 Architects + LLC Washoe County School District Window Replacement No
Description: Incline HS - construction administration services for the window replacement project

 

Date Company Agency Name Project Preference
5/19/2017 Collaborative Design Studio Washoe County School District Building and Sites No
Description: Admin Building - professional services for update of the admin facilities master plan per proposal updated April 19, 2017

 

Date Company Agency Name Project Preference
4/27/2017 The Dube Group, Architect Washoe County School District Door Hardware Replacement Upgrade No
Description: Silver Lake - professional engineering services for design of door hardware replacement for exterior doors and interior cores

 

Date Company Agency Name Project Preference
4/27/2017 GML Architects, LLC Washoe County School District DRS Addition Construction No
Description: Damonte Ranch HS expansion - bidding phase includes: architectural, civil, structural, mechanical, and electrical - administration phase that includes: architectural, civil, structural, mechanical, and electrical - reimbursable expense budget

 

Date Company Agency Name Project Preference
4/20/2017 Frame Architecture Incorporated Washoe County School District Bond Admin No
Description: Capital Projects - proposal to revise three existing open office spaces in rooms 6,7,& 8 - rooms 6 & 7 are to have two new private offices, each with the remaining open space , and room 8 to have another office and in-fill an adjacent door

 

Date Company Agency Name Project Preference
4/11/2017 Cuningham Group Architecture, Inc. Washoe County School District Ed Specs Updates No
Description: High School Educational Specifications - develop education specifications that define the general characteristics; relationships; square footage requirements; amenities; site amenities; furniture, furnishings, and related equipment; and building systems performance for criteria - estimated 2,400 student high school located throughout the district

 

Date Company Agency Name Project Preference
3/22/2017 Hershenow and Klippenstein Architects, Inc Washoe County School District Bella Vista Design No
Description: Sun Valley MS - Architectural/Engineering design services for the new South Meadows Elementary School

 

Date Company Agency Name Project Preference
3/22/2017 Van Woert Bigotti Architects, a Professional Corporation Washoe County School District Spanish Springs MS Design No
Description: Spanish Springs MS Design - Architectural/Engineering design services for the new Spanish Springs MS

 

Date Company Agency Name Project Preference
3/22/2017 Van Woert Bigotti Architects, a Professional Corporation Washoe County School District Sun Valley Design No
Description: Sun Valley MS - Architectural/Engineering design services for the new Sun Valley Area Middle School

 

Date Company Agency Name Project Preference
3/7/2017 PDG Architecture Corp, Nevada Washoe County School District Damonte Ranch Addition Construction No
Description: Damonte Ranch HS - Construction project management and inspection services

 

Date Company Agency Name Project Preference
2/28/2017 Collaborative Design Studio Washoe County School District Board Room Upgrades No
Description: design boardroom upgrade plans that include Fire Marshall corrections, AV designs, casework, and furniture layout

 

Date Company Agency Name Project Preference
2/7/2017 J.R. Romero, Architect Washoe County School District Safety - Attic Access Projects No
Description: Allen ES, Bennett ES, & Alice Smith ES - attic access projects - architect construction administration services

 

Date Company Agency Name Project Preference
2/7/2017 J.R. Romero, Architect Washoe County School District Carpentry - FCIS Repairs - Attic Access No
Description: Caughlin Ranch ES, Desert Heights ES, & Huffaker ES - extra services inserting updated MDPs into sheets - making new permit drawings

 

Date Company Agency Name Project Preference
2/7/2017 J.R. Romero, Architect Washoe County School District Fund 40 Scheduled Scheduled Projects No
Description: Caughlin Ranch ES & Desert Heights ES - attic access projects - architect construction administration services

 

Date Company Agency Name Project Preference
12/23/2016 Cuningham Group Architecture, Inc. Washoe County School District Educational Specifications No
Description: District - provide all services per proposal dated 04/25/2016 as approved by WCSD BOT 05/24/2016

 

Date Company Agency Name Project Preference
12/22/2016 Architects + LLC Washoe County School District Remodels - Overcrowding No
Description: Loder - professional architectural and engineering services for the purpose of converting the original boiler room into a new classroom

 

Date Company Agency Name Project Preference
12/22/2016 Tate Snyder Kimsey Architects Washoe County School District Elementary School Revitalization No
Description: Natchez ES - elementary school revitalization

 

Date Company Agency Name Project Preference
12/22/2016 The Dube Group, Architect Washoe County School District Door Hardware Replacement/Upgrade No
Description: Reno HS - professional services for base drawings and develop bid documents for installation of new locks and cylinders to district standard

 

Date Company Agency Name Project Preference
12/22/2016 Architects + LLC Washoe County School District Elementary School Revitalization No
Description: Picollo School - school revitaliztion

 

Date Company Agency Name Project Preference
12/13/2016 J. R. Romero, Architect Washoe County School District Carpentry - FCIS Repairs No
Description: Dilworth MS, Sparks MS, and Traner MS - attic access improvements - extra services to add access ladders/Donner Springs ES and Double Diamond ES - attic access improvements - extra services to insert updated MDPs to drawings

 

Date Company Agency Name Project Preference
11/21/2016 Stantec Architecture, Inc. City of Las Vegas Gilmore - Cliff Shadows Park No
Description: design of seven acre site with shaded tot lot, swing set, restroom, water play area, group shelter, 4 ramadas, turf area, walkaways, and parking in Las Vegas, NV

 

Date Company Agency Name Project Preference
11/21/2016 Anne Johnson, AIA City of Henderson Henderson Pavilion Monument Sign No
Description: New LED monument sign for the Henderson Pavillion

 

Date Company Agency Name Project Preference
11/16/2016 PDG Architecture Corp, Nevada Washoe County School District Paving No
Description: pavement management training and reporting including verifications for various schools - project development for 2017 EUL program

 

Date Company Agency Name Project Preference
10/24/2016 KGA Architecture City of Las Vegas Medical District Parking Garage No
Description: design bid built project of 750 parking spaces in Las Vegas, Nevada

 

Date Company Agency Name Project Preference
10/24/2016 Aptus Architecure City of Las Vegas DSC 3rd Floor Remodel No
Description: remodel on 3rd floor of the Development Services Center in Las Vegas, Nevada

 

Date Company Agency Name Project Preference
10/17/2016 Hershenow & Klippenstein Architects, Inc. City of Sparks Sparks Municipal Court Security Entrance Remodel No
Description: remodel the existing entrance to the municipal court to include the security screening arena, foyer, and lobby

 

Date Company Agency Name Project Preference
10/10/2016 Paul Cavin Architect LLC Douglas County Public Works Lake Tahoe Administration Building HVAC Upgrades No
Description: professional design services for building HVAC replacement

 

Date Company Agency Name Project Preference
10/4/2016 Architects + LLC Washoe County School District Educational Options No
Description: Washoe Inspire - construction administration

 

Date Company Agency Name Project Preference
9/26/2016 GML Architects, LLC Washoe County School District 2017 ADA Compliance No
Description: Galena HS - design plans for accessibility improvements for ADA

 

Date Company Agency Name Project Preference
9/26/2016 GML Architects, LLC Washoe County School District 2017 ADA Compliance No
Description: Incline HS - design plans for accessibility improvements for ADA

 

Date Company Agency Name Project Preference
9/22/2016 Novus Architecture LLC City of Las Vegas Lieburn Senior Center Additional Room No
Description: enclosure of an existing patio area into additional room for programs at 623 Garwood Avenue in Las Vegas, NV

 

Date Company Agency Name Project Preference
9/20/2016 The Dube Group, Architect Washoe County School District Door Hardware/Replacement Upgrades No
Description: Taylor, Reno, Spanish Springs ES, Van Gorder, McQueen, Westergard, Winnemucca, Damonte Ranch - professional services for base drawings, conduct field investigations, and develop bid documents for installation of new locks and cylinders to district standard

 

Date Company Agency Name Project Preference
8/30/2016 Hooft Architecuture LLC Washoe County School District Asbestos Abatement Projects No
Description: thermal system insulation (TSI) abatement in the following elementary schools: J Duncan, Cannan, Risley, Maxwell, Palmer, Drake, Whitehead, Diedrichsen, Van Gorder, Natchez, Anderson, Loder, Veterans, Booth, Smithridge, Corbett, Hunter, Elmcrest, Peavine, Lenz, Pleasant Valley, Lemmon, Stead, Gomes

 

Date Company Agency Name Project Preference
8/30/2016 Hershenow and Klippenstein Architects, Inc Washoe County School District Signature Academy No
Description: Sparks HS - professional archtitectural design for the Sparks HS Robotics Lab

 

Date Company Agency Name Project Preference
8/30/2016 GML Architects - LLC Washoe County School District Flooring - FCIS Repairs No
Description: Hug HS -four rooms in gym & four rooms in building A; McQueen - room #L1; Sparks HS - nurse's office

 

Date Company Agency Name Project Preference
8/25/2016 Gary Guy Wilson Architect Studios City of Las Vegas Fire Station 103 No
Description: remodel of the fire station at Upland and Jones in Las Vegas, NV

 

Date Company Agency Name Project Preference
8/23/2016 Carpenter SellersDel Gatto Architects City of Henderson Emergency Operations Center (EOC) No
Description: renovate an existing 5,000 sq ft data center in the basement of City Hall for a new EOC facility - renovations to consist of interior renovations and upgrades, new HVAC system, security enhancements, AV/communication, electrical and lighting systems, equipment/furnishings

 

Date Company Agency Name Project Preference
8/10/2016 Van Woert Bigotti Architects, a Professional Corporation Washoe County School District School Site Planning No
Description: plan study for future Sun Valley area middle school and future Arrow Creek area middle school per proposal dated June 27, 2016

 

Date Company Agency Name Project Preference
8/10/2016 Hershenow and Klippenstein Architects, Inc Washoe County School District School Site Planning No
Description: future study for Corona Cyan, Rio Wrangler, future Harris Ranch area elementary schools per proposal dated June 21, 2016.

 

Date Company Agency Name Project Preference
7/20/2016 TSK Washoe County School District Painting - FCIS Repairs No
Description: Mt. Rose ES & Stead ES - exterior painting project

 

Date Company Agency Name Project Preference
7/11/2016 J. R. Romero,Architect Washoe County School District Carpentry - FCIS Repairs No
Description: Hunsberger ES, Mathews ES, Melton ES, Moss ES - attic improvements

 

Date Company Agency Name Project Preference
7/11/2016 Collaborative Design Studio Washoe County School District Carpentry - FCIS repairs No
Description: Hug HS - boys gym lockers replacement project

 

Date Company Agency Name Project Preference
7/7/2016 J. R. Romero, Architect Washoe County School District Mobiles FCIS Repair 2017 Bond Allocation No
Description: Loder - portable #602 exterior siding & skirting project; Sparks HS - portable #609 exterior siding & skirting project; Van Gorder - portable #608 exterior siding and skirting project

 

Date Company Agency Name Project Preference
7/7/2016 The Dube Group, Architect Washoe County School District Projects Under 25K No
Description: Sun Valley - professional services for base drawings, conduct field investigations, and develop bid documents for installation of new locks and cylinders to district standard.

 

Date Company Agency Name Project Preference
7/7/2016 The Dube Group, Architect Washoe County School District Projects Under 25K No
Description: AACT - professional services for base drawings, conduct field investigations, and develop bid documents for installation of new locks and cylinders to district standard.

 

Date Company Agency Name Project Preference
7/6/2016 GML Architects Washoe County School District Remodels -overcrowding No
Description: Damonte Ranch HS - professional design services for school additions

 

Date Company Agency Name Project Preference
6/29/2016 Van Woert Bigotti Architects, a Professional Corporation Washoe County School District Ed Specs Updates No
Description: Districtwide - ed specs updates, costs for architect's involvement in ed specs updates per proposal dated 06/27/2016

 

Date Company Agency Name Project Preference
6/29/2016 Hershenow and Klippenstein Architects, Inc Washoe County School District Ed Specs Update No
Description: Districtwide - ed specs updates, costs for architect's involvement in ed specs updates per proposal dated 06/27/2016

 

Date Company Agency Name Project Preference
6/10/2016 Bull Stockwell & Allen Architects, A California Corporation Incline Village PID, Public Works Division Incline Village Beach House Project No
Description: architectural and engineering design services for the design of the Incline Beach House

 

Date Company Agency Name Project Preference
6/2/2016 PDG Architecture Corp, Nevada Washoe County School District Project Management No
Description: HA - Incline door and door hardware

 

Date Company Agency Name Project Preference
6/2/2016 PDG Architecture Corp, Nevada Washoe County School District Project Management No
Description: Incline MS - project control services for Incline MS exterior paint and seal

 

Date Company Agency Name Project Preference
6/2/2016 PDG Architecture Corp, Nevada Washoe County School District Project Management No
Description: Incline MS - project control services for Incline MS IT MDF HVAC

 

Date Company Agency Name Project Preference
6/1/2016 The Dube Group, Architect Washoe County School District Door Hardware Replacement Upgrade No
Description: Diedrichsen Elementary - professional engineering services for design of hardware replacement for classroom doors only

 

Date Company Agency Name Project Preference
5/31/2016 The Dube Group, Architect Washoe County School District Door Hardware Replacement Upgrade No
Description: Dodson ES - professional engineering services for design of door hardware replacement for classroom doors only

 

Date Company Agency Name Project Preference
5/31/2016 The Dube Grouup, Architect Washoe County School District Door Hardware Replacement Upgrade No
Description: Spanish Springs HS - professional engineering services for design of door hardware replacement for classroom doors only

 

Date Company Agency Name Project Preference
5/25/2016 PDG Architecture Corp, Nevada Washoe County School Distirct 60455 Ed Specs Updates No
Description: districtwide - ed specs update - provide scheduling services for ed specs and all other tasks for ES, MS, & HS for 9 year program per proposal

 

Date Company Agency Name Project Preference
5/25/2016 Hooft Architecture, LLC Truckee Meadows Water Authority Chalk Bluff Control Room, HVAC Replacement and Roofing Project No
Description: design services for the control room update, HVAC replacement, and roofing project at the Chalk Bluff WTP

 

Date Company Agency Name Project Preference
5/16/2016 Collaborative Design Studio Washoe County School District Administration Board Room/AV Media Feasibility Study No
Description: administration building - professional architectural design services for administration board room AV/media feasibility study

 

Date Company Agency Name Project Preference
5/4/2016 Hershenow and Klippenstein Architects, Inc Washoe County School District Signature Acacemy No
Description: Sparks HS - professional architectural design for the Sparks Mechatronics Lab

 

Date Company Agency Name Project Preference
5/3/2016 GML Architects LLC Washoe County School District Galena Greenhouse Signature Design No
Description: Galena HS-professional architectural construction administrative services for Galena greenhouse and classroom remodel

 

Date Company Agency Name Project Preference
4/28/2016 GML Architects LLC Washoe County School District Signature Acadamies No
Description: North Valley HS - construction administrative services - includes construction meetings, substantial completion inspection, and final project description

 

Date Company Agency Name Project Preference
4/26/2016 GML Architects LLC Washoe County School Distrct Nutritional Services No
Description: additonal construction services required on project PO416822 - was closed before the services were required

 

Date Company Agency Name Project Preference
1/1/1900
Description: