AWARDED PUBLIC WORKS PROJECTS

In accordance with Nevada Revised Statutes (NRS 338), awarded public works projects must be submitted to the Nevada State Board of Architecture, Interior Design and Residential Design for posting on the Board's official website.

Posting of awarded projects is for all public works projects, not just those that have been awarded to firms certified to receive local preference.

This posting requirement is in SB268 and is required by the statute effective October 1, 2011.

Posting of Awarded Public Works Projects by Nevada Government Entities

Download the Nevada Government Entity Filing of Awarded Public Works Projects Form and follow the instructions noted on the form.

PUBLIC WORKS PROJECTS AWARDED

Date Company Agency Name Project Preference
7/19/2018 H+K Architects Washoe County School District Conceptual Site Planning NO
Description: Cold Springs MS conceptual site planning.

 

Date Company Agency Name Project Preference
7/6/2018 Architect Plus Washoe County School District Safety and Security NO
Description: Single Point Construction

 

Date Company Agency Name Project Preference
7/2/2018 Van Woert Bigotti Architects Washoe Count School District Single Point Entries No
Description: Scope and Fee Proposal for sigle Point Entries-Angela Bigotti-Chavez #3675

 

Date Company Agency Name Project Preference
5/29/2018 Architects + LLC Washoe County School District O'Brien Middle School No
Description: O'Brien Middle School Caulking Project - professional architectural design services including construction documents, bid and permitting assistance, and construction administration for the window panels

 

Date Company Agency Name Project Preference
5/4/2018 Hershenow & Klippenstein Architects, Inc, Wahoe County School District Stone Gate High School No
Description: professional services for conceptual site design charrette for the proposed Stone Gate High School

 

Date Company Agency Name Project Preference
4/18/2018 Simpson Coulter Studio City of Henderson Hazardous Materials Apparatus Bay No
Description: addition of a new stand-alone bay at Fire Station 98 to house the Hazardous Materials Engine

 

Date Company Agency Name Project Preference
4/17/2018 Sparkflight Studios LLC City of Henderson Water Street District Sign No
Description: new LED sign at the Water Street canopy

 

Date Company Agency Name Project Preference
4/3/2018 GML Architects, LLC Washoe County School District Flooring - FCIS Repairs at Sparks High School No
Description: Additional services for two additional rooms - replacing asbestos containing flooring with new resilient tile and rubber base

 

Date Company Agency Name Project Preference
4/3/2018 KGA Architecture Las Vegas Metropolitan Police Department Las Vegas Metropolitan Police Department Range Building No
Description: architecture services for the new Las Vegas Metropolitan Police Department

 

Date Company Agency Name Project Preference
4/2/2018 LGA City of Las Vegas Corridor of Hope No
Description: A complex that will house and serve the homeless population in downtown Las Vegas. There will be shelter spaces and other amenities provided at the establishment.

 

Date Company Agency Name Project Preference
4/2/2018 Tate, Snyder, Kimsey Architects, Ltd. Washoe County School District Nancy Gomes Elementary School No
Description: Exterior Painting Project

 

Date Company Agency Name Project Preference
2/7/2018 Architects + LLC Washoe County School District Safety and Security No
Description: Dunn ES , Diedrichsen ES, Lenz ES, Dodson ES, Whitehead ES, and Glenn Hare HS - architectural and engineering services for single point of entry design

 

Date Company Agency Name Project Preference
1/25/2018 Collaborative Design Studio Washoe County School District Safety and Security No
Description: Incline ES - architectural and limited engineering services for Incline ES single point of entry

 

Date Company Agency Name Project Preference
1/25/2018 Architects + LLC Washoe County School District Safety and Security No
Description: Dunn ES, Diedrichsen ES, Lenz ES, Dodson ES, Whitehead ES, and Glen Hare HS - architectural and engineering services fro single point of entry

 

Date Company Agency Name Project Preference
1/25/2018 Architects + LLC Washoe County School District Painting - FCIS Repairs No
Description: Washoe Inspire Academy - architectural and engineering design services to replace existing fascia and soffits with metal clad

 

Date Company Agency Name Project Preference
1/23/2018 Hershenow & Klippenstein Architects, Inc. Washoe County School District Wildcreek Design No
Description: Wildcreek HS Design - architectural/engineering services for schematic phase design - approved by BOT on December 12, 2017

 

Date Company Agency Name Project Preference
1/23/2018 Van Woert Bigotti Architects, a Professional Corporation Washoe County School District Arrowcreek Design Services No
Description: Arrowcreeek MS - architectural/engineering design services for new Arrowcreek MS - approved by BOT on January 16, 2018

 

Date Company Agency Name Project Preference
1/23/2018 GML Architects, LLC Washoe County School District Facility Upgrades No
Description: Nutrition Services - construction administration for dry storage and technician office/repair areas

 

Date Company Agency Name Project Preference
1/17/2018 Suzana Rutar, Architect, Ltd., A Professional Corporation City of Las Vegas Public Works Cimarron Rose Room Addition No
Description: provide an additional room to accommodate the growth and capacity of the existing break facility to include additional parking

 

Date Company Agency Name Project Preference
1/9/2018 Architects + LLC Washoe County School District Safety and Security No
Description: Dunn ES, Diedrichsen ES, Dodson ES, and Whitehead ES - provide architectural and engineering services for single point of entry

 

Date Company Agency Name Project Preference
12/20/2017 GML Architects, LLC Washoe County School District Fd40 ADA Bank No
Description: Reed HS - Architectural ADA Assessment of the Reed HS Theater

 

Date Company Agency Name Project Preference
12/20/2017 Architects + LLC Washoe County School District Window Replacement No
Description: Clayton MS - construction administration for window replacement

 

Date Company Agency Name Project Preference
12/18/2017 TVS Nevada, Inc. Las Vegas Convention and Visitors Authority LVCCD Expansion No
Description: Professional services for design of the Las Vegas Convention Center District Expansion (LVCCD)

 

Date Company Agency Name Project Preference
12/14/2017 GML Architects, LLC Washoe County School District ADA FCIS Repairs No
Description: McQueen HS - scope of work to make nurses station/restroom fully ADA compliant

 

Date Company Agency Name Project Preference
10/5/2017 Hershenow and Klippenstein Architects, Inc. Washoe County School District Master Planning No
Description: District Wide Master Planning - perform services to update AIA general conditions with supplementary and special conditions to 2017 version per proposal dated 09/20/2017

 

Date Company Agency Name Project Preference
10/5/2017 Hershenow and Klippenstein Architects, Inc. Washoe County School District HS Master Planning No
Description: HS Master Planning - perform services for Wildcreek area master planning in conjunction with engineering due diligence per proposal dated 10/2/2017

 

Date Company Agency Name Project Preference
9/28/2017 BJG Architecture and Engineering City of Sparks Community Services Municipal Court Space Planning Project No
Description: This project will present options for the City of Sparks Municipal Court Building in making a decision as to stay in its existing building, lease a new building, or lease a building requiring tenant improvements.

 

Date Company Agency Name Project Preference
9/12/2017 Hershenow and Klippenstein Architects, Inc. Washoe County School District Signature Academy No
Description: Sparks HS - construction administration for Sparks HS Robotics Lab

 

Date Company Agency Name Project Preference
9/11/2017 ATA Architecture, LLC City of Henderson Public Works, Parks, and Recreation Fire Station 95 Restroom Renovation No
Description: renovate existing multi-stall restrooms into gender neutral single stall toilet and shower rooms

 

Date Company Agency Name Project Preference
9/11/2017 ATA Architecture, LLC City of Henderson Public Works, Parks, and Recreation Convention Center Fire Riser No
Description: design and construction for a new fire riser (and associated utilities work) and a new pump room

 

Date Company Agency Name Project Preference
9/7/2017 Architects + LLC Washoe County School District Window Replacement No
Description: Clayton MS - design and specifications for window replacement project

 

Date Company Agency Name Project Preference
8/30/2017 Hooft Architecture LLC Washoe County School District Carpentry - FCIS Repairs No
Description: Wooster HS - design services to repair/replace deteriorating exposed wooden beam tails along exterior walkway canopy

 

Date Company Agency Name Project Preference
8/30/2017 Tate Snyder Kimsey Architects, Ltd. Washoe County School District 2018 Painting - FCIS Repair No
Description: Getto Transportation Facility - exterior paint project - proposal includes bidding plans and specifications

 

Date Company Agency Name Project Preference
8/30/2017 Hooft Architecture LLC Washoe County School District Asbestos Abatement No
Description: Veterans ES- design services to abate and replace trasite ceiling

 

Date Company Agency Name Project Preference
8/30/2017 GML - Architecture LLC Washoe County School District Flooring - FCIS Repairs No
Description: Various Schools - flooring replacement

 

Date Company Agency Name Project Preference
8/30/2017 GML - Architecture LLC Washoe County School District ADA Compliance No
Description: Incline HS - professional services for design and construction documents for ADA signage upgrade

 

Date Company Agency Name Project Preference
8/30/2017 GML - Architecture LLC Washoe County School District ADA Compliance No
Description: Galena HS - professional services for design and construction documents for ADA Signage Upgrades

 

Date Company Agency Name Project Preference
8/30/2017 J. R. Romero, Architect Washoe County School District Carpentry - FCIS Repairs No
Description: Spanish Springs ES - Attic Access Improvements

 

Date Company Agency Name Project Preference
8/30/2017 Tate Snyder Kimsey Architects, Ltd. Washoe County School District 2018 Painting - FCIS Repair No
Description: Vaughn MS - exterior painting project - proposal includes bidding plans and specifications

 

Date Company Agency Name Project Preference
8/9/2017 Architects + LLC Washoe County School District Grounds Building Replacement No
Description: Brown Center - professional architectural and engineering services to provide a new ground building at the Brown Center site

 

Date Company Agency Name Project Preference
8/9/2017 J. R. Romero, Architect Washoe County School District Mobiles - FCIS Repairs No
Description: Loder ES, Van Gorder ES, and Sparks HS - extra services required by Regulated Systems and Assessments reissuing out-of-date MDPs to be attached to the drawings for the Portable Residing/Reskirting Project

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Winnemucca ES - design services for flooring replacement

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Lemelson ES - design services for replacement of ceramic tile flooring

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Loeder ES - design services for replacement of sheet vinyl flooring with resilient tile flooring

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: McQueen HS & Glen Hare - professional services for design and construction documents for ADA restroom upgrades

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Galena HS - design services for carpet replacement

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Hug HS - design services for replacement of various flooring

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Sparks HS - design services for ceramic floor tile and carpet over VAT floor replacement

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: Wooster HS - design services for replacement of carpet floor tile

 

Date Company Agency Name Project Preference
7/25/2017 GML Architects, LLC Washoe County School District 2018 Flooring FCIS Repairs No
Description: McQueen HS - design services for resilient floor replacement

 

Date Company Agency Name Project Preference
7/20/2017 Hershenow and Klippenstein Architects, Inc Washoe County School District Signature Academy No
Description: Sparks HS - professional architectural design services for Sparks HS robotics lab and new ADA restrooms

 

Date Company Agency Name Project Preference
7/20/2017 The Dube Group, Architect Washoe County School District Door Hardware Replacement/Upgrade No
Description: Various Schools - professional services for base drawings, conduct field investigations, and develop bid documents for installation of new locks and cylinders to district standard

 

Date Company Agency Name Project Preference
7/20/2017 Architects + LLC Washoe County School District Window Replacement No
Description: Clayton MS - design & specifications for window replacement

 

Date Company Agency Name Project Preference
7/20/2017 Architects + LLC Washoe County School District Window Replacement No
Description: Clayton Ms - construction administration services for window replacement project

 

Date Company Agency Name Project Preference
7/6/2017 Tate Snyder Kimsey Architects, Ltd. Washoe County School District Washoe County School District 2018 Painting FCIS Repair No
Description: Lemmon Valley ES - replace existing acoustical ceilings in 8 classrooms - proposal includes bidding plans & specs

 

Date Company Agency Name Project Preference
6/27/2017 GML Architects, LLC Washoe County School District Nutrition Services Expansion Phase I & II No
Description: Nutrition Service Center - dry storage & technician office/repair areas at nutrition services center

 

Date Company Agency Name Project Preference
6/21/2017 Hooft Architecture LLC Truckee Meadows Water Authority TMWA Pilot Testing Project No
Description: Architectural design and consultant design services

 

Date Company Agency Name Project Preference
6/15/2017 J.R. Romero, Architect Washoe County School District Safety Projects No
Description: Various schools - extra services required by Regulated Systems & Assessment's re-issuing out-of-date MDP's to be attached to the drawings for the attic access improvements at schools having lead-containing paints

 

Date Company Agency Name Project Preference
6/15/2017 J.R. Romero, Architect Washoe County School District Carpentry FCIS Repairs No
Description: Silver Lake ES, Westergard ES, Winnemucca ES, & Van Gorder ES - architectural design services only to improve the safety access to existing attics

 

Date Company Agency Name Project Preference
6/15/2017 J.R. Romero, Architect Washoe County School District Mobile FCIS Repairs No
Description: Spanish Springs ES - construction documents, drawings, and technical specs for re-siding and painting of Spanish Springs ES mobile classroom #613

 

Date Company Agency Name Project Preference
6/15/2017 J.R. Romero, Architect Washoe County School District Mobile FCIS Repairs No
Description: Beasley ES - construction documents, drawings, and technical specs for re-siding and painting of Bud Beasley ES mobile classroom #616

 

Date Company Agency Name Project Preference
5/23/2017 The Dube Group, Architect Washoe County School District Door Hardware Replacement Upgrade No
Description: Damonte Ranch HS - professional engineering services for design of door hardware replacement for exterior and interior doors

 

Date Company Agency Name Project Preference
5/19/2017 Architects + LLC Washoe County School District Window Replacement No
Description: Incline HS - construction administration services for the window replacement project

 

Date Company Agency Name Project Preference
5/19/2017 Collaborative Design Studio Washoe County School District Building and Sites No
Description: Admin Building - professional services for update of the admin facilities master plan per proposal updated April 19, 2017

 

Date Company Agency Name Project Preference
4/27/2017 The Dube Group, Architect Washoe County School District Door Hardware Replacement Upgrade No
Description: Silver Lake - professional engineering services for design of door hardware replacement for exterior doors and interior cores

 

Date Company Agency Name Project Preference
4/27/2017 GML Architects, LLC Washoe County School District DRS Addition Construction No
Description: Damonte Ranch HS expansion - bidding phase includes: architectural, civil, structural, mechanical, and electrical - administration phase that includes: architectural, civil, structural, mechanical, and electrical - reimbursable expense budget

 

Date Company Agency Name Project Preference
4/20/2017 Frame Architecture Incorporated Washoe County School District Bond Admin No
Description: Capital Projects - proposal to revise three existing open office spaces in rooms 6,7,& 8 - rooms 6 & 7 are to have two new private offices, each with the remaining open space , and room 8 to have another office and in-fill an adjacent door

 

Date Company Agency Name Project Preference
4/11/2017 Cuningham Group Architecture, Inc. Washoe County School District Ed Specs Updates No
Description: High School Educational Specifications - develop education specifications that define the general characteristics; relationships; square footage requirements; amenities; site amenities; furniture, furnishings, and related equipment; and building systems performance for criteria - estimated 2,400 student high school located throughout the district

 

Date Company Agency Name Project Preference
3/22/2017 Hershenow and Klippenstein Architects, Inc Washoe County School District Bella Vista Design No
Description: Sun Valley MS - Architectural/Engineering design services for the new South Meadows Elementary School

 

Date Company Agency Name Project Preference
3/22/2017 Van Woert Bigotti Architects, a Professional Corporation Washoe County School District Spanish Springs MS Design No
Description: Spanish Springs MS Design - Architectural/Engineering design services for the new Spanish Springs MS

 

Date Company Agency Name Project Preference
3/22/2017 Van Woert Bigotti Architects, a Professional Corporation Washoe County School District Sun Valley Design No
Description: Sun Valley MS - Architectural/Engineering design services for the new Sun Valley Area Middle School

 

Date Company Agency Name Project Preference
3/7/2017 PDG Architecture Corp, Nevada Washoe County School District Damonte Ranch Addition Construction No
Description: Damonte Ranch HS - Construction project management and inspection services

 

Date Company Agency Name Project Preference
2/28/2017 Collaborative Design Studio Washoe County School District Board Room Upgrades No
Description: design boardroom upgrade plans that include Fire Marshall corrections, AV designs, casework, and furniture layout

 

Date Company Agency Name Project Preference
2/7/2017 J.R. Romero, Architect Washoe County School District Safety - Attic Access Projects No
Description: Allen ES, Bennett ES, & Alice Smith ES - attic access projects - architect construction administration services

 

Date Company Agency Name Project Preference
2/7/2017 J.R. Romero, Architect Washoe County School District Carpentry - FCIS Repairs - Attic Access No
Description: Caughlin Ranch ES, Desert Heights ES, & Huffaker ES - extra services inserting updated MDPs into sheets - making new permit drawings

 

Date Company Agency Name Project Preference
2/7/2017 J.R. Romero, Architect Washoe County School District Fund 40 Scheduled Scheduled Projects No
Description: Caughlin Ranch ES & Desert Heights ES - attic access projects - architect construction administration services

 

Date Company Agency Name Project Preference
12/23/2016 Cuningham Group Architecture, Inc. Washoe County School District Educational Specifications No
Description: District - provide all services per proposal dated 04/25/2016 as approved by WCSD BOT 05/24/2016

 

Date Company Agency Name Project Preference
12/22/2016 Architects + LLC Washoe County School District Remodels - Overcrowding No
Description: Loder - professional architectural and engineering services for the purpose of converting the original boiler room into a new classroom

 

Date Company Agency Name Project Preference
12/22/2016 Tate Snyder Kimsey Architects Washoe County School District Elementary School Revitalization No
Description: Natchez ES - elementary school revitalization

 

Date Company Agency Name Project Preference
12/22/2016 The Dube Group, Architect Washoe County School District Door Hardware Replacement/Upgrade No
Description: Reno HS - professional services for base drawings and develop bid documents for installation of new locks and cylinders to district standard

 

Date Company Agency Name Project Preference
12/22/2016 Architects + LLC Washoe County School District Elementary School Revitalization No
Description: Picollo School - school revitaliztion

 

Date Company Agency Name Project Preference
12/13/2016 J. R. Romero, Architect Washoe County School District Carpentry - FCIS Repairs No
Description: Dilworth MS, Sparks MS, and Traner MS - attic access improvements - extra services to add access ladders/Donner Springs ES and Double Diamond ES - attic access improvements - extra services to insert updated MDPs to drawings

 

Date Company Agency Name Project Preference
11/21/2016 Stantec Architecture, Inc. City of Las Vegas Gilmore - Cliff Shadows Park No
Description: design of seven acre site with shaded tot lot, swing set, restroom, water play area, group shelter, 4 ramadas, turf area, walkaways, and parking in Las Vegas, NV

 

Date Company Agency Name Project Preference
11/21/2016 Anne Johnson, AIA City of Henderson Henderson Pavilion Monument Sign No
Description: New LED monument sign for the Henderson Pavillion

 

Date Company Agency Name Project Preference
11/16/2016 PDG Architecture Corp, Nevada Washoe County School District Paving No
Description: pavement management training and reporting including verifications for various schools - project development for 2017 EUL program

 

Date Company Agency Name Project Preference
10/24/2016 KGA Architecture City of Las Vegas Medical District Parking Garage No
Description: design bid built project of 750 parking spaces in Las Vegas, Nevada

 

Date Company Agency Name Project Preference
10/24/2016 Aptus Architecure City of Las Vegas DSC 3rd Floor Remodel No
Description: remodel on 3rd floor of the Development Services Center in Las Vegas, Nevada

 

Date Company Agency Name Project Preference
10/17/2016 Hershenow & Klippenstein Architects, Inc. City of Sparks Sparks Municipal Court Security Entrance Remodel No
Description: remodel the existing entrance to the municipal court to include the security screening arena, foyer, and lobby

 

Date Company Agency Name Project Preference
10/10/2016 Paul Cavin Architect LLC Douglas County Public Works Lake Tahoe Administration Building HVAC Upgrades No
Description: professional design services for building HVAC replacement

 

Date Company Agency Name Project Preference
10/4/2016 Architects + LLC Washoe County School District Educational Options No
Description: Washoe Inspire - construction administration

 

Date Company Agency Name Project Preference
9/26/2016 GML Architects, LLC Washoe County School District 2017 ADA Compliance No
Description: Galena HS - design plans for accessibility improvements for ADA

 

Date Company Agency Name Project Preference
9/26/2016 GML Architects, LLC Washoe County School District 2017 ADA Compliance No
Description: Incline HS - design plans for accessibility improvements for ADA

 

Date Company Agency Name Project Preference
9/22/2016 Novus Architecture LLC City of Las Vegas Lieburn Senior Center Additional Room No
Description: enclosure of an existing patio area into additional room for programs at 623 Garwood Avenue in Las Vegas, NV

 

Date Company Agency Name Project Preference
9/20/2016 The Dube Group, Architect Washoe County School District Door Hardware/Replacement Upgrades No
Description: Taylor, Reno, Spanish Springs ES, Van Gorder, McQueen, Westergard, Winnemucca, Damonte Ranch - professional services for base drawings, conduct field investigations, and develop bid documents for installation of new locks and cylinders to district standard

 

Date Company Agency Name Project Preference
8/30/2016 Hooft Architecuture LLC Washoe County School District Asbestos Abatement Projects No
Description: thermal system insulation (TSI) abatement in the following elementary schools: J Duncan, Cannan, Risley, Maxwell, Palmer, Drake, Whitehead, Diedrichsen, Van Gorder, Natchez, Anderson, Loder, Veterans, Booth, Smithridge, Corbett, Hunter, Elmcrest, Peavine, Lenz, Pleasant Valley, Lemmon, Stead, Gomes

 

Date Company Agency Name Project Preference
8/30/2016 Hershenow and Klippenstein Architects, Inc Washoe County School District Signature Academy No
Description: Sparks HS - professional archtitectural design for the Sparks HS Robotics Lab

 

Date Company Agency Name Project Preference
8/30/2016 GML Architects - LLC Washoe County School District Flooring - FCIS Repairs No
Description: Hug HS -four rooms in gym & four rooms in building A; McQueen - room #L1; Sparks HS - nurse's office

 

Date Company Agency Name Project Preference
8/25/2016 Gary Guy Wilson Architect Studios City of Las Vegas Fire Station 103 No
Description: remodel of the fire station at Upland and Jones in Las Vegas, NV

 

Date Company Agency Name Project Preference
8/23/2016 Carpenter SellersDel Gatto Architects City of Henderson Emergency Operations Center (EOC) No
Description: renovate an existing 5,000 sq ft data center in the basement of City Hall for a new EOC facility - renovations to consist of interior renovations and upgrades, new HVAC system, security enhancements, AV/communication, electrical and lighting systems, equipment/furnishings

 

Date Company Agency Name Project Preference
8/10/2016 Van Woert Bigotti Architects, a Professional Corporation Washoe County School District School Site Planning No
Description: plan study for future Sun Valley area middle school and future Arrow Creek area middle school per proposal dated June 27, 2016

 

Date Company Agency Name Project Preference
8/10/2016 Hershenow and Klippenstein Architects, Inc Washoe County School District School Site Planning No
Description: future study for Corona Cyan, Rio Wrangler, future Harris Ranch area elementary schools per proposal dated June 21, 2016.

 

Date Company Agency Name Project Preference
7/20/2016 TSK Washoe County School District Painting - FCIS Repairs No
Description: Mt. Rose ES & Stead ES - exterior painting project

 

Date Company Agency Name Project Preference
7/11/2016 J. R. Romero,Architect Washoe County School District Carpentry - FCIS Repairs No
Description: Hunsberger ES, Mathews ES, Melton ES, Moss ES - attic improvements

 

Date Company Agency Name Project Preference
7/11/2016 Collaborative Design Studio Washoe County School District Carpentry - FCIS repairs No
Description: Hug HS - boys gym lockers replacement project

 

Date Company Agency Name Project Preference
7/7/2016 J. R. Romero, Architect Washoe County School District Mobiles FCIS Repair 2017 Bond Allocation No
Description: Loder - portable #602 exterior siding & skirting project; Sparks HS - portable #609 exterior siding & skirting project; Van Gorder - portable #608 exterior siding and skirting project

 

Date Company Agency Name Project Preference
7/7/2016 The Dube Group, Architect Washoe County School District Projects Under 25K No
Description: Sun Valley - professional services for base drawings, conduct field investigations, and develop bid documents for installation of new locks and cylinders to district standard.

 

Date Company Agency Name Project Preference
7/7/2016 The Dube Group, Architect Washoe County School District Projects Under 25K No
Description: AACT - professional services for base drawings, conduct field investigations, and develop bid documents for installation of new locks and cylinders to district standard.

 

Date Company Agency Name Project Preference
7/6/2016 GML Architects Washoe County School District Remodels -overcrowding No
Description: Damonte Ranch HS - professional design services for school additions

 

Date Company Agency Name Project Preference
6/29/2016 Van Woert Bigotti Architects, a Professional Corporation Washoe County School District Ed Specs Updates No
Description: Districtwide - ed specs updates, costs for architect's involvement in ed specs updates per proposal dated 06/27/2016

 

Date Company Agency Name Project Preference
6/29/2016 Hershenow and Klippenstein Architects, Inc Washoe County School District Ed Specs Update No
Description: Districtwide - ed specs updates, costs for architect's involvement in ed specs updates per proposal dated 06/27/2016

 

Date Company Agency Name Project Preference
6/10/2016 Bull Stockwell & Allen Architects, A California Corporation Incline Village PID, Public Works Division Incline Village Beach House Project No
Description: architectural and engineering design services for the design of the Incline Beach House

 

Date Company Agency Name Project Preference
6/2/2016 PDG Architecture Corp, Nevada Washoe County School District Project Management No
Description: HA - Incline door and door hardware

 

Date Company Agency Name Project Preference
6/2/2016 PDG Architecture Corp, Nevada Washoe County School District Project Management No
Description: Incline MS - project control services for Incline MS exterior paint and seal

 

Date Company Agency Name Project Preference
6/2/2016 PDG Architecture Corp, Nevada Washoe County School District Project Management No
Description: Incline MS - project control services for Incline MS IT MDF HVAC

 

Date Company Agency Name Project Preference
6/1/2016 The Dube Group, Architect Washoe County School District Door Hardware Replacement Upgrade No
Description: Diedrichsen Elementary - professional engineering services for design of hardware replacement for classroom doors only

 

Date Company Agency Name Project Preference
5/31/2016 The Dube Group, Architect Washoe County School District Door Hardware Replacement Upgrade No
Description: Dodson ES - professional engineering services for design of door hardware replacement for classroom doors only

 

Date Company Agency Name Project Preference
5/31/2016 The Dube Grouup, Architect Washoe County School District Door Hardware Replacement Upgrade No
Description: Spanish Springs HS - professional engineering services for design of door hardware replacement for classroom doors only

 

Date Company Agency Name Project Preference
5/25/2016 PDG Architecture Corp, Nevada Washoe County School Distirct 60455 Ed Specs Updates No
Description: districtwide - ed specs update - provide scheduling services for ed specs and all other tasks for ES, MS, & HS for 9 year program per proposal

 

Date Company Agency Name Project Preference
5/25/2016 Hooft Architecture, LLC Truckee Meadows Water Authority Chalk Bluff Control Room, HVAC Replacement and Roofing Project No
Description: design services for the control room update, HVAC replacement, and roofing project at the Chalk Bluff WTP

 

Date Company Agency Name Project Preference
5/16/2016 Collaborative Design Studio Washoe County School District Administration Board Room/AV Media Feasibility Study No
Description: administration building - professional architectural design services for administration board room AV/media feasibility study

 

Date Company Agency Name Project Preference
5/4/2016 Hershenow and Klippenstein Architects, Inc Washoe County School District Signature Acacemy No
Description: Sparks HS - professional architectural design for the Sparks Mechatronics Lab

 

Date Company Agency Name Project Preference
5/3/2016 GML Architects LLC Washoe County School District Galena Greenhouse Signature Design No
Description: Galena HS-professional architectural construction administrative services for Galena greenhouse and classroom remodel

 

Date Company Agency Name Project Preference
4/28/2016 GML Architects LLC Washoe County School District Signature Acadamies No
Description: North Valley HS - construction administrative services - includes construction meetings, substantial completion inspection, and final project description

 

Date Company Agency Name Project Preference
4/26/2016 GML Architects LLC Washoe County School Distrct Nutritional Services No
Description: additonal construction services required on project PO416822 - was closed before the services were required